Run data lets a normal Revit schedule show one row per physical run: its name, installed length, bends, elbows and ends, and whether the figures are up to date. You can order, price and check the bend limit per pull without measuring by hand after every change. It is a project opt-in, off by default.

Add run data to a project

  1. Open Check routes

    Click Check routes on the ribbon.

  2. Click Add run data to this project…

    It is on the list, on one route’s page and under More ▴ in the Check routes window. The dialog says what the six columns add and what they need.

  3. Click Add run data

    It adds six shared parameters to conduit and conduit fittings and fills the routes that have a record of their ends, in one undo step.

  4. Record older routes

    Routes without a record of their ends stay unknown until you use Record ends or Record all.

Make the schedule

No schedule is made for you. Create a normal multi-category schedule, add these columns and filter Pembris Run by has a value. Only one element per run carries the values, so the filter leaves one row per run. Units follow the project.

ColumnWhat it shows
Pembris RunThe run’s name. Re-route and Update keep it while the two pull points still identify the same run.
Pembris BendsTotal bend angle to the next device, box, tray or tee, counted as Check routes counts bends.
Pembris ElbowsThe number of elbow fittings. Curves in a flexible drop are bends, not elbows.
Pembris Ends atThe run’s two pull points.
Pembris Run lengthInstalled centreline length, including curved fittings and their straight tails.
Pembris CheckedWhen the figures were last confirmed, or Out of date after an edit that affects the run.

Keep it up to date

  • After an edit that affects a run, Pembris Checked reads Out of date and Check routes reports Run data out of date, also when someone typed over the values.
  • Update run data confirms the totals for a route, the selection or the routes shown, in one undo step, without changing geometry. A run shared by several routes needs all of them selected.
  • Split parts need Record ends first, and copies need Adopt, which gives them new run names. The original keeps its name.
  • The route watch only reports out-of-date run data. It never recalculates totals.

Turn it off

Once it is on, the button reads Run data…. It shows the runs, offers Update run data of N for the out-of-date ones, and Turn off…. Turn off run data? removes the six parameters in one undo step, and schedules lose those columns. Run records on our elements stay, so adding run data again keeps each run’s name.