Run Check project before you issue a model or send it to coordination. It checks every Pembris Electrical route in the project, whatever the view shows, and every conduit run Pembris Electrical didn’t draw. You get a short list of what’s wrong, a fix where there is one, and a list to hand on. It is not a certificate of the whole model.
Run it
Open a view Check routes can highlight in
The view and selection don’t decide what is checked: every route in the project is.
Click Check project
It sits beside Check routes on the Check panel. The Check routes window opens, titled Check project.
Let it check
Up to 500 routes and runs are checked, ours first, a few at a time while Revit stays usable. Stop keeps what was checked; Check next routes takes the next 500.
Work through the filters
Open Filter, beside the search, and tick a kind of problem to list only those routes. Each active kind shows as a chip that removes it. A kind goes when its problems are all fixed.
What it counts
| Filter | Findings | Fix |
|---|---|---|
| Clashes | Clash, Too close, Target in the route’s way | Re-route… |
| Runs over the bend limit | Too many bends | Re-route… |
| Missing fittings | Conduit joined straight to conduit at an angle over 1°, with no fitting between | Re-route… |
| Unjoined ends | Not joined, End detached, Incomplete | Re-route… where it can fix it. Never on Not joined: Revit would refuse the same join again. |
| Other problems | Target deleted, End dragged, hard zone broken | The finding’s own fix, such as Route again… for a deleted device |
| Not checked | Any part of a route that couldn’t be checked; run data that needs confirmation | Read why. For run data, Update run data. |
When the project passes
The head of the list says all routes pass only once checking ends, every route and run was checked in full, none has a problem and nothing is left for Check next routes.
- Notes (split, edited by hand, a turned device, an older route) never stop a pass.
- Anything not checked does, including a branching run drawn by hand.
- With run data on, stale or edited totals stop a pass until you Update run data.
What it refuses
More than 20,000 route elements or 20,000 conduits, or a closed workset, is refused and nothing is checked: Check project never checks part of a project and presents it as the project. A project with no routes and no conduit says so. Linked models are not read.
Hand it on
More › Copy list puts the routes shown on the clipboard, one row each, ready to paste into a spreadsheet. Filter first to copy only one kind of problem.
Estimated tray landing load
If the project has turned on its tray-capacity policy, a tray report opens first: every receiving tray recorded by Pembris drops, with its estimated load against the project limit and over-limit sections in warning colours. Continue to routes goes on; Cancel or Esc stops there. It estimates conduit landing on the tray, not cable fill. See Tray capacity and project targets.